Dunoon Pier
Dublin Core
Title
Description
The first Dunoon Pier appeared in 1835. The pier was enlarged and a new waiting room constructed in 1867 to cater for the growth of paddle-steamer traffic and this was further improved with a larger 400 foot jetty in 1881. The pier was again rebuilt in 1895 resulting in the two-berth structure broadly as it exists today.
The pier entrance building is very striking with red-tiled roofs and strongly detailed timber in chocolate, cream and yellow.? Fleets of paddle steamers brought holidaymakers from Glasgow to Dunoon and many other piers right up to the late 1960s and the pier is still visited by the last sea-going paddle steamer in the world, P.S.Waverley.?
In July 2009, the Waverley had to be taken out of service after it struck Dunoon Pier in what was described by the Waverley website as ?landing heavily?. Both the steamer and the pier were damaged and several passengers suffered minor injuries.
By early 2010, the condition of the pier buildings had deteriorated badly and there was a general assumption that they would be demolished. Indeed, at a public meeting early in 2008 to discuss the options for Dunoon?s regeneration under the CHORD project,none of the options included retention of the pier, the proposals for Dunoon having included reclamation of land on the waterfront and the creation of an ?iconic building?, perhaps a hotel or conference centre.
However, in May 2010, local resident and Argyll and Bute councillor, Ron Simon, raised the proposal that Dunoon Pier had the potential to become a major attraction for the town, rather than an expensive liability. It soon became clear that the majority view in the local community was that the iconic pier should be restored to become such a major attraction for locals and visitors to the town.
As of the end of June 2011 the Gourock ? Dunoon vehicle and passenger ferry service no longer used the Victorian pier and it therefore had no specific transport function. However, a strategy document drafted in November 2011 reported that it had become clear from focus group and public consultation feedback that the historical significance of the pier and the potential benefits it could provide for Dunoon waterfont had generated a strong desire for it to be retained and restored.
Argyll and Bute Council thus became committed to the restoration of the pier and a series of detailed surveys were undertaken. Finally in June 2014, the council agreed to invest over ?2million to secure the pier substructure and refurbish the main waiting room and the harbour master?s building.? The Pier Waiting Room has now been refurbished.
Source
Date
Type
Identifier
Spatial Coverage
Museum Item Type Metadata
Street
Place
IsNewThisYear
OpeningDate1
OpeningDate2
OpeningTime1
OpeningTime2
WC
DisabledWC
DisabledAccess
Refreshments
EventsForChildren
Parking
HearingLoop
LimitedAccess
NotAccessible
ID
IsIncludedThisYear
Postcode
Citation
Embed
Copy the code below into your web page